200 TPD Gold Ore Processing Plant Equipment Configuration: How to Match Crushers, Ball Mills, and CIL Tanks for Higher Recovery

SHARE TO:

If you are setting up a 200 TPD gold ore processing plant, you have probably asked yourself: what jaw crusher do I need? How big should the ball mill be? How many CIL tanks? This article breaks it down in plain language.

200 TPD is a sweet spot for small to medium gold miners. Not too small, not too big. But many operators lose recovery because the equipment doesn’t match. A 200 TPD plant is a chain. One weak link and gold goes to the tailings.

Jiangxi Hengchang Mining Machinery Equipment has built many 200 TPD gold CIL plants in China and overseas. Here’s what we’ve learned.

First: 200 TPD = 8–10 tons per hour. Don’t size blindly.

200 TPD means 200 tons per day. If you run 24 hours, that’s 8.3 tph. If you run 20 hours, that’s 10 tph. Always add 10–20% margin. So design for 10–12 tph. This affects crusher and ball mill selection.

Also, know your ore. Free milling gold? Sulfide? Clay? Refractory? Do a test. A 200 TPD plant with the wrong flowsheet is money down the drain.

Crushing and grinding: match jaw, cone, and ball mill

For 200 TPD hard rock gold, a typical configuration looks like this:

Feeding: GZD850x3000 vibrating feeder
Primary crushing: PE250x400 jaw crusher (capacity 5–20 tph)
Secondary crushing: PYB600 cone crusher (10–25 tph) or fine jaw crusher
Screening: 2YK1237 vibrating screen, closed circuit with cone
Grinding: MQY1830x3600 overflow ball mill (8–12 tph)
Classification: spiral classifier FG-7.5 or hydrocyclone FX-250

Why this matters: gold recovery in CIL depends on liberation. You want P80 around 75–106 µm. Too coarse, gold locked in sulfide. Too fine, slimes coat carbon and cyanide consumption goes up. A matched ball mill and classifier give you steady grind.

Hengchang’s 1830x3600 ball mill is popular for 200 TPD. It has a rolled steel shell, high manganese liners, and can be configured with rubber liners to reduce iron contamination. The discharge size is adjustable.

文章插图

CIL tanks: how many and how big?

This is where many 200 TPD plants get it wrong. CIL combines leaching and adsorption. You need enough retention time. Typical leach time: 24–48 hours. For 200 TPD, slurry flow is about 15–20 m³/h at 40% solids. So total tank volume for 24h is 360–480 m³.

Most 200 TPD CIL plants use 6 to 8 tanks. Each tank 50–60 m³. For example:

7 tanks x 50 m³ = 350 m³. With 24h retention, you can process 200 TPD if slurry density is right.
First 1–2 tanks: pre-leach (no carbon).
Next 5–6 tanks: carbon-in-leach.
文章插图
Carbon concentration: 10–25 g/L. Carbon moves counter-current to slurry. Air agitation or mechanical agitation.

Hengchang’s CIL tanks come with efficient agitators, air lifts, and carbon retention screens. The tanks are epoxy-coated or stainless steel to prevent corrosion. They also offer automatic carbon advance systems.

Key point: don’t buy too few tanks. If you only have 4 tanks of 50 m³, you get 12h leach. Recovery drops. For 200 TPD, 6–8 tanks is safe.

Application scenarios: where 200 TPD CIL shines

Small underground gold mine: 200 TPD matches one or two shifts. Easy to permit.
Tailings reprocessing: 200 TPD CIL can recover gold from old tailings.
Remote areas: 200 TPD plant is modular. Can be shipped in containers. Hengchang designs skid-mounted options.
Oxide and free-milling ore: simple flowsheet, high recovery.

Note: alluvial gold is better with gravity. CIL is for hard rock.

Success cases: domestic and international

China, Shandong – 200 TPD gold CIL plant Ore: fine disseminated gold, 2.5 g/t, 3% sulfide. Before, they used a small ball mill and 4 leach tanks. Recovery was 85%. After upgrading with Hengchang equipment: PE250x400 jaw, PYB600 cone, 1830x3600 ball mill, 7 x 50 m³ CIL tanks. Grind P80 80 µm. Cyanide 0.05%. Recovery hit 93.5%. They also added a carbon elution system. The plant runs 24h with 2 operators per shift.

Tanzania – 200 TPD gold CIL project Ore: oxidized gold, high clay, 3.8 g/t. The clay caused problems in crushing. Hengchang recommended a jaw crusher plus a washing screen before grinding. Equipment: PE250x400 jaw, PYB600 cone, 1830x3600 ball mill, 6 x 50 m³ CIL tanks. Recovery 91%. Carbon consumption was 0.3 kg/t. The plant paid back in about 14 months.

Zimbabwe – 200 TPD sulfide gold plant Ore: sulfide, 4.2 g/t, 1.5% pyrite. They used flotation + CIL. Hengchang supplied ball mill, flotation cells, and CIL tanks. Recovery 88% from flotation plus 94% from concentrate CIL. Overall 92%.

Philippines – 200 TPD oxide gold plant Ore: free milling, 2.8 g/t. Simple flowsheet: jaw crusher, ball mill, 6 CIL tanks. Recovery 95%. They used Hengchang’s 1830x3600 ball mill and 6 x 50 m³ CIL tanks. Low cyanide consumption 0.2 kg/t.

These cases show: a 200 TPD plant can get 90–95% recovery if equipment matches the ore. No magic. Just correct grind, enough leach time, and good carbon management.

Equipment configuration table for 200 TPD gold CIL plant

Stage Equipment Recommended Model Notes
Feeding Vibrating feeder GZD850x3000 80–120 tph capacity, variable speed
Primary crushing Jaw crusher PE250x400 5–20 tph, set CSS 40–60 mm
Secondary crushing Cone crusher PYB600 10–25 tph, closed circuit
Screening Vibrating screen 2YK1237 2 deck, 10–20 tph
Grinding Ball mill MQY1830x3600 8–12 tph, overflow type
Classification Hydrocyclone FX-250 or spiral classifier FG-7.5
Thickening Thickener Φ9m high rate, with flocculant
Leaching/Adsorption CIL tanks 7 x 50 m³ epoxy coated, agitator
Carbon transfer Air lift – automatic
Elution Elution column 1 t/h AARL or Zadra
Electrowinning Electrowinning cell – 100–200 A
Smelting Furnace 20 kg gold bullion

This is a starting point. Your ore may need adjustments. For example, if your ore is sticky, add a washing screen before the cone. If sulfide, add flotation. If refractory, add BIOX or roasting – but that’s beyond 200 TPD.

文章插图

How to match for higher recovery: 5 practical tips

Grind size is king. Do a grind curve. Test 60, 80, 100 µm. Find the P80 where gold recovery plateaus. Don’t overgrind.
Leach time cannot be rushed. For 200 TPD, 24h minimum. 30h better. Use 6–8 tanks.
Carbon management. Carbon concentration 10–25 g/L. Advance carbon daily. Screen carbon to remove fines.
pH and cyanide. Keep pH 10.5–11. Cyanide 0.05–0.1%. Measure daily.
文章插图

Oxygen. CIL tanks need dissolved oxygen >5 ppm. Air spargers or agitators. Hengchang tanks have efficient air injection.

Why Jiangxi Hengchang Mining Machinery Equipment?

Hengchang has been in mining equipment for decades. They don’t just sell you a jaw crusher or ball mill. They provide a complete 200 TPD gold ore processing plant configuration. Their team does ore testing, flowsheet design, equipment manufacturing, installation, and commissioning.

For 200 TPD CIL plants, Hengchang offers:

Jaw crushers, cone crushers, hammer crushers
Ball mills with rubber or steel liners
CIL tanks with high-efficiency agitators and carbon screens
Elution and electrowinning systems
Spare parts and training

They have projects in China, Tanzania, Zimbabwe, Philippines, Sudan, Ghana, and more. If you want a 200 TPD plant that actually hits 90%+ recovery, get the equipment matched to your ore. Not copied from a brochure.

Final words

A 200 TPD gold ore processing plant is not about buying the biggest crusher or the most tanks. It’s about matching. Match crusher to ore hardness. Match ball mill to grind target. Match CIL tanks to leach time. Then you get higher recovery.

Start with a test. Then talk to Jiangxi Hengchang Mining Machinery Equipment. They’ll give you a 200 TPD configuration that fits your gold ore, your site, and your budget. Don’t guess. Match it.

If you have questions about 200 TPD gold CIL plant equipment configuration, leave a comment. Happy to help.