100 TPD Tungsten Ore Plant Cost
So you're planning a 100 TPD tungsten ore plant and want to know the cost. Short answer: there's no single sticker price. A 100 TPD plant is small, but it's still a full flowsheet. The cost swings a lot based on ore type, grade, and where you build it. This guide breaks it down in plain English, with real-world examples and practical tips. We'll also mention where Jiangxi Hengchang Mining Machinery Equipment fits into the picture.
Quick answer: what does a 100 TPD tungsten plant cost?
For a complete 100 TPD tungsten processing plant, a rough planning range is:
Equipment only: $80,000 – $350,000Equipment + installation + commissioning: $120,000 – $500,000
Complete project with civil works, power, water, permits, and contingency: $200,000 – $800,000+
These are not quotes. Your actual number depends on ore test results and local conditions.
Why 100 TPD is still a "real" plant
100 tons per day = about 4–5 tons per hour. It's a small plant. But tungsten is heavy. You need crushing, grinding, gravity and/or flotation, dewatering, and tailings. So even at 100 TPD, you can't skip the basics.
The 5 biggest cost drivers
1. Ore type: wolframite vs scheelite
Wolframite is usually gravity. Scheelite is often flotation. Gravity plant is cheaper. Flotation plant costs more because of reagents, agitators, and control. If your ore has both, you may need both.
2. Grade and liberation
High-grade, coarse-grained ore is cheaper. You can crush to a coarse size and use jigs. Fine-grained, low-grade ore needs fine grinding, more stages, and more equipment. That raises cost.
3. Process route
Typical 100 TPD tungsten flowsheet:
Crushing: jaw crusher + cone crusher or hammer crusherScreening: vibrating screen
Grinding: ball mill + spiral classifier or hydrocyclone
Gravity: jig, shaking table, spiral chute, centrifugal concentrator
Flotation: if scheelite, flotation cells, agitators, reagent feeders
Dewatering: thickener, filter press, dryer
Tailings: pump, pipeline, tailings pond
4. Location and infrastructure
A plant in Jiangxi, China, can be cheaper because equipment and labor are local. A plant in Nigeria, Bolivia, or Kazakhstan will pay more for freight, customs, installation, and power. If you need a generator, that's extra. If water is scarce, you need recycling.
5. Automation level
Manual control is cheaper. PLC control with sensors costs more. For 100 TPD, many operators choose semi-automatic: simple control panel, local starters, and some monitoring. That keeps cost down without sacrificing too much.
Cost breakdown for a 100 TPD tungsten plant
Here's a realistic ballpark. Again, these are planning ranges, not fixed prices.
1. Crushing and screening
Jaw crusher, cone crusher, vibrating screen, feeders, conveyors.
Range: $15,000 – $60,000
If ore is hard, you need a cone crusher. If soft, a hammer crusher may do.
2. Grinding and classification
Ball mill, classifier, hydrocyclone, slurry pump.
Range: $25,000 – $90,000
Grinding is the heart. Don't undersize the mill. A 100 TPD plant usually uses a 900x1800 or 1200x2400 ball mill.
3. Gravity separation
Jig, shaking table, spiral chute, centrifugal concentrator.
Range: $15,000 – $70,000
For wolframite, gravity is the main method. You may need 2–3 stages of shaking tables.
4. Flotation
Flotation cells, agitators, reagent system, air blower.
Range: $20,000 – $100,000
For scheelite, flotation is key. Reagent cost is ongoing.
5. Magnetic/electrostatic separation
If your concentrate has tin, tantalum, or other heavy minerals.
Range: $5,000 – $40,000
6. Dewatering
Thickener, filter press, dryer, pumps.
Range: $10,000 – $50,000
You need dry concentrate for shipping. Filter press is common.
7. Tailings and water
Tailings pump, pipeline, water pump, recycling system.
Range: $5,000 – $35,000
Environmental rules matter. Don't skip this.
8. Electrical and control
Cables, panels, starters, PLC, instruments.
Range: $10,000 – $50,000
Semi-automatic is a good balance for 100 TPD.
9. Steel structure, piping, installation
Platforms, chutes, pipes, valves, labor.
Range: $15,000 – $70,000
If you import equipment, add freight and customs.
10. Engineering, commissioning, training
Flow design, test work, spare parts, training.
Range: $10,000 – $50,000
Good engineering saves money later.
Total equipment + installation: $120,000 – $500,000
Complete project with civil, land, power, permits: $200,000 – $800,000+
Operating cost (OPEX) for 100 TPD
For 100 TPD, OPEX is usually $10 – $30 per ton. That includes:
Power: 20–40 kWh per ton. Big cost.Water: 1–3 tons per ton.
Reagents: only for flotation. Scheelite reagent cost is higher.
Labor: 4–10 people per shift, depending on automation.
Maintenance and wear parts: liners, jaws, screens, tables.
Tailings management.
So monthly OPEX for 100 TPD (30 days) could be $30,000 – $90,000. Your tungsten price and recovery decide if it's profitable.
Real-world cases and application scenarios
Let's look at how 100 TPD tungsten plants work in different places. These are typical patterns from project experience, including Jiangxi Hengchang Mining Machinery Equipment.
Case 1: Ganzhou, Jiangxi, China — 100 TPD wolframite gravity plant
Ore: wolframite in quartz vein. Grade: 0.3% WO3.
Process: jaw crusher → cone crusher → ball mill → jig → shaking table → magnetic separator → filter press.
Equipment: Jiangxi Hengchang supplied the full line.
Result: concentrate grade around 65% WO3, recovery around 80%.
Cost: equipment and installation around $180,000. Local labor and power kept OPEX low.
Case 2: Hunan, China — 100 TPD scheelite flotation plant
Ore: scheelite with calcite and fluorite. Grade: 0.25% WO3.
Process: crushing → grinding → flotation (roughing, cleaning, scavenging) → thickener → filter press.
Equipment: Jiangxi Hengchang flotation cells and ball mill.
Result: concentrate grade around 70% WO3, recovery around 75%.
Cost: higher than gravity, around $260,000 for equipment and installation. Reagent cost is about $3–5 per ton.
Case 3: Bolivia — 100 TPD tungsten tailings reprocessing
Ore: old tailings with wolframite and cassiterite.
Process: scrubbing → screening → jig → shaking table → magnetic separation.
Equipment: Jiangxi Hengchang provided jigs, tables, and pumps.
Result: recovered about 60% WO3 from tailings.
Cost: around $130,000 because no crushing or grinding was needed for coarse tailings.
Case 4: Nigeria — 100 TPD wolframite plant
Ore: alluvial and hard rock wolframite.
Process: mobile jaw crusher → ball mill → centrifugal concentrator → shaking table.
Equipment: Jiangxi Hengchang supplied a modular plant.
Result: concentrate grade around 60% WO3, recovery around 70%.
Cost: around $150,000. Freight and installation added $30,000.
Case 5: Kazakhstan — 120 TPD tungsten-molybdenum plant
Ore: wolframite with molybdenite.
Process: crushing → grinding → gravity → flotation → dewatering.
Equipment: Jiangxi Hengchang and local partners.
Result: separate tungsten and molybdenum concentrates.
Cost: around $350,000 for equipment. Higher because of two circuits.
These cases show one thing: 100 TPD tungsten plant cost is not fixed. Ore type, process route, and location change everything.
How to keep your 100 TPD tungsten plant cost under control
1. Do a proper ore test first.
Don't guess. Send 50–100 kg sample to a lab. A good test tells you the right flowsheet. Jiangxi Hengchang can help with test work and flow design.
2. Match equipment to your ore, not to a catalog.
A 100 TPD plant doesn't need a huge mill. But it does need the right one. Oversizing wastes money. Undersizing kills recovery.
3. Go modular where possible.
Modular plants are faster to build and cheaper to ship. They work well for 100 TPD.
4. Use local labor and materials.
Import only critical equipment. Build steel structures and tanks locally if you can.
5. Plan for maintenance.
Keep spare parts for jaw plates, mill liners, screens, and table decks. Downtime costs more than parts.
6. Think about tailings early.
Tailings permits can delay your project. Design a simple tailings pond or recycling system from day one.
Why Jiangxi Hengchang Mining Machinery Equipment?
Jiangxi Hengchang Mining Machinery Equipment (江西恒昌矿山机械设备) has been making mining equipment for decades. They focus on gravity separation, flotation, and complete small-to-medium plants. For a 100 TPD tungsten plant, they can provide:
Ore test and flowsheet design.Crushing, grinding, gravity, flotation, and dewatering equipment.
Installation and commissioning support.
Training for your operators.
Spare parts and after-sales service.
They have projects in China, Africa, South America, and Central Asia. If you want a realistic budget, ask them for a quote based on your ore.
Final thoughts
So what does a 100 TPD tungsten ore plant cost? A realistic planning range is $120,000 to $500,000 for equipment and installation, and $200,000 to $800,000+ for a complete project. The biggest cost drivers are ore type, process route, and location. Wolframite gravity plants are cheaper. Scheelite flotation plants cost more. Tailings projects can be cheaper if you skip crushing and grinding.
Don't buy equipment before you test your ore. Don't copy someone else's flowsheet. And don't forget OPEX. A cheap plant that can't run is expensive.
If you're serious about a 100 TPD tungsten project, start with an ore test and a proper cost estimate. Jiangxi Hengchang Mining Machinery Equipment can help you get both. Get the flow right, and the cost will make sense.